Sponsored Links

Senin, 25 Desember 2017

Sponsored Links

Ballpark Renderings | Chicago Cubs
src: chicago.cubs.mlb.com

Since purchasing the Chicago Cubs baseball team and Wrigley Field in 2009, the Ricketts family have been pursuing an extensive renovation of the stadium and the surrounding venue. At its outset, the 1060 Project (so called after Wrigley Field's Addison Street address) was projected to cost $575 million and was to be completed in four phases during consecutive off-seasons. Funding was generated from advertising revenue and increased corporate sponsorship in the form of additional signage placed in and around the stadium.


Video Wrigley Field renovations



History

The initial plan, revealed during the annual Cubs Convention in January 2013, called for a $575-million, privately funded rehabilitation of the stadium to be completed over the course of five years. The proposal included improvements to the stadium's facade, infrastructure, restrooms, concourses, suites, press box, bullpens, and clubhouses, as well as the addition of restaurants, patio areas, batting tunnels, a 5,700-square-foot jumbotron, and an adjacent hotel, plaza, and office-retail complex.

Months of negotiations between the team, local Alderman Tom Tunney, and Chicago Mayor Rahm Emanuel occurred with the eventual endorsements of the city's Landmarks Commission and the Plan Commission and final approval by the Chicago City Council in July 2013.


Maps Wrigley Field renovations



Funding

Increased advertising signage, in and around the park, help to fund the four phases of the renovation. Before the renovation began, the majority of the rooftop club owners that surround the stadium felt that such signs would obstruct their sight-lines and render them out of business.

Wrigley rooftops

Prior to 1980, the rooftops provided a vantage point and were a gathering place for free views of the ongoing Cubs games. Since the observers were a few dozen people watching from the flat rooftops and windows of the buildings, with "seating" consisting of a few folding chairs, there was little commercial impact on the Cubs. When the popularity of the Cubs began to rise in the 1980s, formal seating structures began to appear, and building owners began charging admission, much to the displeasure of Cubs management, who saw it as an unreasonable encroachment. In 2002, the Cubs filed a lawsuit against the different facilities for copyright infringement. In 2004, 11 of the 13 roofs settled with the club, out of court, agreeing to pay 17% of gross revenue in exchange for official endorsement. With the Cubs and the neighbors reaching agreement, many of the facilities erected permanent seating structures: some with bleachers, some with chair seats, and even one with a steel-girdered double deck of seats. By 2014, 15 of those buildings' structures that were once residential apartments had evolved into rooftop businesses with state-of-the-art multi-level facilities solely and exclusively used to sell tickets for a bird's eye views into the stadium to watch a Cubs game.

Before work on the project began, the team wanted the rooftop owners to agree not to pursue legal action challenging the construction and continued to negotiate privately with them - offering to reduce the size and number of signs to be built - in order to gain their assent. The rooftop owners had a lease with the team until 2023 in exchange for paying 17% of the gross revenues. Unable to reach an agreement with the rooftop owners by May 2014, the Cubs said that they would pursue the original 2013 plan to modify the park. In the early months of 2015, the Ricketts family purchased three of the rooftop properties. In the middle of the 2015 season, they purchased three more.


Flying over the Wrigley Renovations - Nick Ulivieri ...
src: www.nickulivieriphotography.com


Beginning

The five-year renovation project, projected to cost $575 million, started as soon as the 2014 season was completed. Prior to the start of the 2015 season, both left and right field bleachers were expanded and the stadium was extended further onto both Waveland Avenue to the north and Sheffield Avenue to the east. Seven new outfield signs were installed along with a 2,400-square-foot video scoreboard in right field. Construction was begun on new locker rooms and lounges to exist in an underground area that was excavated along Clark Street to the west.

Architectural team

In an effort to preserve the past while at the same time modernizing for the future, the Cubs engaged DAIQ Architects, a company with experience in modernizing Fenway Park in Boston, Massachusetts, Citizens Bank Park in Philadelphia, Pennsylvania, and Turner Field in Atlanta, Georgia. T. Gunny Harboe of Harboe Architects, a historic preservation architect who worked on the Rookery Building and Sullivan Center in the Chicago Loop, was selected to be the architect in charge of preserving the historic features and 1930s characteristics of the ballpark. VOA Associates, which helped design the new Navy Pier, provided construction drawings and Icon Venue Group is the project management company.

Phase One, 2014-15 off-season

The west parking lots adjacent to the field are the future location of Triangle Plaza and the Cubs' new office building. Structural steel and concrete work continued throughout the stadium complex during the 2015 season with the addition of new concession areas and restroom facilities, outfield group terraces and a reworked third-base side concourse.

Protecting the ivy

Wrigley Field has distinct outfield walls which are covered by a combination of Boston ivy and Japanese bittersweet. The ivy was planted 80 years ago in 1937, having been an idea of future MLB owner Bill Veeck years earlier.

2015 season

Due to delays caused by cold weather and construction restrictions, the renovations in left and center field were delayed until May 11 while the right-field bleachers were finished in mid-June. Attendance during the opening weeks of the 2015 season was affected by the unavailability of approximately 5,000 bleacher seats. The announced crowd for the home opener against the St. Louis Cardinals was 35,055 while the second game of the series drew 26,814. Prior to the renovation, seating capacity for Wrigley Field was 41,160.

Triangle Plaza, west of the stadium

Work continued throughout the summer of 2015 on the foundation and structural work for the Cubs' new clubhouse and office building as well as an open-air plaza and retail space. The excavation for the future home of the 30,000-square-foot Cubs' clubhouse and new office building was completed in July. Work continued during the off-season and the completed clubhouse was ready by Opening Day of the 2016 season. Support columns for a six-story office building, which will house the Cubs' administrative offices and a ground-floor retail space, have been installed and the building is expected to be completed by late 2016.


Ballpark Renderings | Chicago Cubs
src: chicago.cubs.mlb.com


Middle

Phase Two, 2015-16 off-season

After the close of the extended 2015 season, work began to convert the excavated area just west of the field into a 30,000-square-foot area for players' locker rooms, strength, conditioning, training and hydrotherapy sections, players' lounges, a media center and team offices. The previous clubhouse space will be utilized to enlarge the dugout and add two underground batting cages, an auditorium and more team office space. Premium and season ticket holders will be afforded a new "Third Base Club" next to the batting tunnels and a "Home Plate Club" will be introduced behind home plate. All seats, from the left-field foul pole to the main gate, will be removed and replaced and new concessions and bathrooms will be added. An upper-deck exposed concourse will be added along the south and west roof-line of right field. Improved bathroom facilities and additional concessions are included.

Marquee

On November 2, 2015, workers began dismantling the marquee and relocating it for renovation and refurbishment. The marquee had been in place since 1933. The marquee was returned on April 5, 2016.

Statues

The statue of famed broadcaster Harry Caray was returned to the promenade outside the center field gate. The statues of Hall of Famers Ron Santo and Billy Williams were returned to the corner of Addison and Sheffield by the right field entrance. The Ernie Banks statue was placed at the Main entrance at the corner of Addison and Clark.

Improvements

  • New terra-cotta and steelwork to replicate the original 1930s wrought iron.
  • Refurbished ticket windows on the corner of Addison and Clark streets.
  • Plaques honoring the 15 Chicago Cub Hall of Famers (near the main entrance)
  • Signage and photo-op situations along the right field entrance.
  • Repaint the old center field scoreboard
  • 5 display cases containing Cubs and Wrigley Field history.
  • New hot dog venues behind the Marquee and in Right Field stands.

Phase Three, 2016-17 off-season

Upon the conclusion of game five of the 2016 World Series, off season construction preparations began for implementing the third phase of the 5-year project. Placement of a chain link fence around the external ballpark wall was temporarily delayed to allow Cub fans to continue to express their joy with chalk drawings and comments (as they had throughout the playoffs and into the World Series).

Improvements

  • Structural improvements were implemented to the right field bleachers. Both home and visitor bullpen areas were relocated to areas under the bleacher seating. The Cubs bullpen is under the left field seats while the visitors bullpen is under the right field seats. New seating was added to the vacated bullpen areas. Seating was realigned along the right and left field foul lines.
  • A visiting team "batting tunnel" was added. Right field concourse ramps and stairs were reconstructed and bathroom facilities under the concourse were improved.
  • New padded seats were added in the area behind home plate.
  • New flag poles were added along the back wall of the bleachers to accommodate World Series banners.
  • The south facade and main entry gate was restored at the corner of Addison Avenue and Clark Street.
  • The outfield turf was replaced just prior to the start of the 2017 season.
  • The Hotel Zachary project is on-going.
  • The new Cubs administrative building containing a new Cubs Store and construction of "The Park at Wrigley", above the Cubs players dressing room, is complete. The Park area is restricted as a "tickets-only" area before and during games but is open to the public at other times.

Flying over the Wrigley Renovations | Baseball Ballparks | Pinterest
src: s-media-cache-ak0.pinimg.com


Final

Phase Four, 2017-18 off-season

With the early conclusion of the 2017 season, permits were acquired and work began on the fourth phase of off-season improvements. The area under the seats behind home plate will be the location of the American Airlines 1914 Club, the first of four premier luxury clubs to be located around the park. Both players dugouts will be relocated during the 2018 season to allow construction of an additional two clubs. The last club, located in the upper level, is planned for the 2019 season.

Improvements

  • American Airlines 1914 Club behind home plate
  • Maker's Mark Barrel Room behind the visitors' dugout
  • W Club along the third-base line
  • Catalina Club in the upper level

Ballpark Renderings | Chicago Cubs
src: chicago.cubs.mlb.com


Added year

In March 2015, just prior to the baseball season, Ricketts announced an additional year will be required to complete the 1060 project.


More Wrigley Field Renovation Plans Revealed - Bleed Cubbie Blue
src: cdn3.vox-cdn.com


Completion

The completed project, including a Sheraton Hotel across from Wrigley on Clark and a plaza south of Clark and Waveland Avenue, is expected to be finished by the opening of the 2019 season.


Wrigley Field renovation project approved | abc7chicago.com
src: cdn.abclocal.go.com


References

Source of the article : Wikipedia

Comments
0 Comments